Data centres
We cover the first stage of the chain: finding and reading a site, establishing how much power is genuinely available and when, and presenting it to the right counterparties.

Power availability and connection timing determine a site’s value more than its area and more than the land price: cheap land with a ten-year wait is not cheap land. We assess sites across Italy on their infrastructure, not their region.
We therefore work in euros per MW, always stating which stage a figure refers to and what evidence supports it: a requested MW, a MW with an accepted connection offer and a contracted MW are not worth the same. Euros per hectare remain a check against the local land market.
The project’s requirement, or the power stated in a connection request. On its own it says nothing about whether or when it will be available.
What the grid operator’s documents show: a connection offer (STMG) issued and accepted, a connection agreement, works, costs and stated timing. These are different stages and not interchangeable.
The power a project can rely on, with works completed and supply conditions defined. Power at the grid intake and power available to IT equipment must also be distinguished.
Each level needs its own evidence. A connection request, on its own, says nothing about whether or when the power will be available.
Finding land consistent with the requirements of a data centre project.
Gross and net developable area, shape, constraints, access, distance to long-haul fibre.
Reading the documents available: the stage the connection request has reached, stated timing and its basis, current land use and the route to a variant.
Presenting the site to developers, colocation operators and infrastructure funds, at the stage of development at which each engages.
MC21 does not carry out technical surveys: it organises and coordinates them with the professionals the parties appoint.
For landowners proposing a site. No confidential documents are needed at first contact: just say which ones exist.
Propose a siteDevelopers, operators and infrastructure funds can share target areas, power, timing and the development stage they accept. We assess sites against those requirements.
Share your site requirementsPractical guide
What a grid connection request, an STMG and an STMD mean for data centre land in Italy, and why requested power is not yet available capacity.
Practical guide
The terms that recur in Italian hotel deals and data centre sites, briefly explained: from ADR and RevPAR to affitto d’azienda and STMG.